Home / Quality

The mill certifies the heat. We check the drums.

Every drum carries a heat-lot number that ties back to the furnace record and the lab report. This page shows the trail and who is responsible for each step.

Furnace to drum

Ten steps, two responsibilities.

01–08 · The producing mill09–10 · OlaMetals
  1. 01 · MillRaw material inLots logged by origin and certificate.
  2. 02 · MillAluminothermic reductionThe alloy forms in a controlled reaction.
  3. 03 · MillRefiningA second melt strips gas and slag.
  4. 04 · MillOne ingot per heatThe unit the certificate describes.
  5. 05 · MillCrush and blendHomogenised so every drum matches.
  6. 06 · MillInspectionThe lump is sorted before packing.
  7. 07 · MillLaboratoryChemistry and gas content per heat lot.
  8. 08 · MillCertificateReleased only inside your window.
  9. 09 · OlaMetalsPre-loading checkWe weigh, seal and photograph the drums.
  10. 10 · OlaMetalsExport and freightLicence where needed, documents, your Incoterm.

One ingot per heat, up to 1.2 t. Lots are blended up to 20 t, so every drum matches. The laboratory is accredited to ISO/IEC 17025:2017. Figures as reported by the mill.

Inspection at the mill

Three ways of looking at the same lump.

Contamination that reaches your crucible costs a heat. Every lump passes visible light, ultraviolet light and X-ray on an automated line before it is packed: the first finds oxidised pieces, the second slag, the third dense unreacted metal.

Visual

Surface, fracture and colour. Slag and oxide skins are pulled by hand.

Ultraviolet

Black light shows the contamination the eye misses.

X-ray

High-density inclusions are caught before they are packed.

Our check in China

What we do before the container closes.

GRADEHEAT LOT ·····NET ··· kgDRUM ·· / ··
  • Drum labels read against the certificate and the packing list: grade, heat lot, drum number
  • Net weights checked
  • Seals applied and recorded
  • Photos of the sealed drums and the loaded container sent to you

This is our own inspection as the seller. It does not replace the mill's certificate or your incoming inspection.

Documents

The papers that travel with the goods.

Per heat lotCertificate of analysisThe mill's own certificate: full element scan and gas content against your window.
Per shipmentPacking listDrum-level lot numbers and net weights, matching the labels.
Per shipmentPre-loading photo setSealed drums and the loaded container, from our check.
Export setInvoice, bill of lading, originCertificate of origin stating the true origin. No transshipment.
Per gradeSafety data sheetSDS and REACH status for buyers in the European Union.
Controlled gradesExport licenceFor tantalum, tungsten and some vanadium grades, with end-use documents.

Want to see a sample certificate?

It comes with the quote, together with the mill's certification scope.

Request a quote
Request a quote